Access
Production casing was cut at 208–209 meters and a bridge plug and packer isolated the treatment interval.

Case study 059 · Vermilion River, Alberta
After two conventional cement squeezes produced little to no improvement, a two-day BioSqueeze treatment permanently eliminated serious-classification surface casing vent flow.
The challenge
An operator needed to eliminate vent flow on a vertical well being plugged near Lloydminster. The well, drilled in 2006, showed approximately 17.9 m³/day of flow on the 177.8 mm by 244.5 mm annulus and pressure buildup exceeding 1,700 kPa after 11 hours.
RCBL, noise/temperature and CHAT diagnostics were used to evaluate the failure. Advanced Cement Imaging identified the Lea Park interval as the likely gas source. Two conventional cement squeezes had produced little to no effect on gas flow.
The treatment
Production casing was cut at 208–209 meters and a bridge plug and packer isolated the treatment interval.
One acid stage removed debris and improved access into the active gas channels.
Seven stages of low-viscosity biomineralization fluids were injected at constant pressure.
Falling injection rate and pressure falloff confirmed progressive sealing of connected pathways.
The result
Leakage pathways sealed, allowing plugging to proceed.
A pronounced decline in injection rate showed the pathway closing as crystalline calcium carbonate formed a gas-tight barrier.
In the oil and gas sector, the SCP becomes the silent warning bell that no operator can turn a blind eye to. The SCP refers to the pressure existing between the casing strings or between the casing and tubing,…
Read article →The regulatory landscape around methane emissions from the oil and gas sector has shifted dramatically in the past year. EPA has loosened flaring and vent gas requirements, Congress repealed the Waste Emissions…