Prepare the pathway
The initial channel was cleaned with acid and neutralized before biomineralization treatment.
Case study 057 · Erie County, New York
Two separate annular flow paths were treated with BioSqueeze. Both were sealed, sustained casing pressure was eliminated and the well was approved for plugging and abandonment.
The challenge
An operator contracted BioSqueeze to eliminate annular gas on the 4½-inch by 6⅝-inch annulus of a storage well being prepared for abandonment. Cement-bond logging showed sporadic intervals with little or no cement coverage.
After a cut was made in the 4½-inch casing at 490 feet, bubbling shifted from the annulus to the wellbore, confirming connection to the gas channel. During the initial BioSqueeze treatment, bubbling was also observed on the outer 6⅝-inch by 10¾-inch annulus, revealing a second connected integrity problem.
The treatment
The initial channel was cleaned with acid and neutralized before biomineralization treatment.
BioSqueeze was injected through the casing cut at 490 feet to seal flow on the 4½-inch by 6⅝-inch annulus.
Deep-penetrating perforations were placed at 370–373 feet through both casing strings.
A second staged BioSqueeze treatment addressed the 6⅝-inch by 10¾-inch annulus.
The result
Both annuli sealed. SCP eliminated. Well approved for P&A.
The case demonstrates how low-viscosity, self-diverting treatment can address multiple connected pathways within a complex well architecture.