Use the active leak
The same connected pathway carrying gas provides access for water-like treatment fluids.

Case study 056 · DeWitt County, Texas
BioSqueeze was deployed on a previously plugged well that continued leaking gas to surface—a difficult abandonment problem where the original barrier had not isolated the connected pathway.
The challenge
Gas reaching surface after plugging indicates that one or more connected pathways remain open around or through the existing abandonment barriers. Reworking these wells can become expensive when the pathway is small, remote from the wellbore or distributed through damaged cement.
BioSqueeze was selected to access the active pathway with low-viscosity treatment fluids and form a mineral seal in place without relying on bulk cement placement alone.
The treatment
The same connected pathway carrying gas provides access for water-like treatment fluids.
Treatment preferentially enters the most conductive channel and moves outward as permeability falls.
Calcium carbonate precipitates within the leakage network rather than bridging at its entrance.
The objective is a permanent gas-tight mineral seal that complements the existing plug system.
The result
An existing plug can be present while a separate connected leakage pathway remains open.
This case illustrates a recurring asset-retirement problem: a barrier may remain incomplete even after conventional plugging material has been placed.
Persistent leaks can turn a routine plugging schedule into repeated remedial work. Planning those wells into a dedicated treatment sequence gives operators more control over access, verification, and the work that follows.